Well its wired, the lights look ok, next job is to put amber lights on the underside of the bridge, red light on the centre of the span, also to install the piling on the pier, then repeat the process at the other end

Posted by rbrindley3 AKA Fred at 2021-10-02 13:49:23 UTC