Movement π track laying all done for now, couple of sticky spots to look at, but not too shabby. Polarity switches to wire next, all droppers are fitted just need the control panel sorting and then switches can be wired in, best progress though, getting a train moving π
Posted by PeteT at 2021-10-03 18:15:42 UTC