Couple of things about Clydebridge Station. Firstly, I started work on the depot car park area today. I've removed the balsa wood the signalbox sat on, and replaced it with a bit of 2mm SMS greyboard. I wrapped that in concrete, and the signalbox will sit on that. The base will be glued down to the surface once the paint has dried in the car park. The signalbox will be placed onto the base. I've repainted the car park, as I've got the ugly thick white lines. These have been painted over matt black, as has other parts of the car park. Luckilly, I've found some white lines from when I done the street scene, and I can use those to make the new lines. I've run out of concrete wrap so the depot office will have to sit on a bit greyboard, cut to the exact same size as the office. I've also built a BRUTE trolley today, not painted it yet, but the wheels were a bugger to put on. Thank goodness SMS supply spare wheels. And lastly, I've got the phone line moving back to BT to match my broadband and BT Sport. The new deal, £20 a month cheaper than having Broadband with BT phone with Sky, also sees them sending me new internet equipment, namely a hub, meaning my speeds will be faster. The upshot, hopefully future videos will be uploaded quicker!

Posted by Robert Clark at 2021-10-31 17:12:45 UTC