Progress on the depot at clydebridge Station. The base for the signal box is glued down, and the signal box is placed on it. It's not glued down, so I can remove it for access to the siding. The depot office will sit on It's own on the left. I've also started to do work on the hardstanding. I've scraped away some of the ballast, and glued down some 2mm greyboard. The next thing is to scrape some ballast off in the 6ft so the greyboard can sit flush with the rails. Expect an order next week for greyboard and hardstanding. Btw @justin.noble are you able to find out if it was 2mm greyboard I ordered this year for the station concourse?
Posted by Robert Clark at 2021-11-04 15:14:11 UTC