Some of the hardstanding is now down in the depot at clydebridge Station. I'll lay more at a later date, take a break from the hardstanding. Notice that I've left the ballast in place, where the gap narrows at the points. As it would be difficult to scrape up the remaining ballast there, I've decided to leave it in situ.
Posted by Robert Clark at 2021-11-11 11:54:02 UTC