Creating some imperfections in the concrete: scoring lines to represent breaks when pouring the wet cement and chips out of the edges from damage. These should pick up later weathering washes that I do and be quite subtle :) 🤞
Posted by Riverbank Railways at 2021-11-13 23:13:05 UTC