Work has been happening on the old factory buildings (theoretically) pre-existing on the site. All new windows and vents are going in and these dimensions have to be catered for. The architects have just packed up for the night. There's not much to show for the time spent but a lot of measuring has taken place. They are waiting on some more brick and stone samples before they present the finished plan to Hops.

Posted by Rachel at 2021-11-15 23:17:35 UTC