Three Down (well nearly!) Two to Go! Work has been steadily progressing on Abandoned Project No.2 with three of the sheds nearing completion. They will all be "trimmed" with a black base both inside and out, have green wooden trim where appropriate and "corrugated" roof styling. The exterior and interior finish will be SMS Cornish stone wrap with SMS concrete wrap flooring. At present the roof on each one is removable to allow LEDโs to be fitted. The shed with the curved roof still requires one door opening to be trimmed with 3mm x 3mm pine strip. This project should have been completed 5 months ago if I had only been properly organised - hence being referred to as a "muddler" rather than a "modeller" by my wife!๐๐ - Ken.
Posted by Ken at 2021-11-16 10:19:43 UTC