The mock up for the buttress walls for the river side walk, and bridge pillars, its taken me all week to make the walls in total there are twenty separate pieces, each will have to be mitred. We will have to make coping stones for the top piece.
Posted by rbrindley3 AKA Fred at 2021-11-18 15:04:46 UTC