Today’s progress before my hands and back gave out! I’ve extended the upper loops so I’m just about to add the final curves. There’s going to be tunnel openings on the lower loops as it dives between the supports for the upper loop so you’ll capture a glimpse here and there of the train. I’ve started laying the track to the yard so that I can lay out the plant wash and office block in temporary positions for now. They’ve only just come out of the box but I’ll need to wire in the signal box and offices once they arrival in their final position!

Posted by Ian Hewitt at 2021-05-05 17:33:43 UTC