Learning all the time. I have discovered that when you think that after you have laid ballast you need to leave the ballast to dry out for at least 3-4 days before cleaning off the glue on the rails. The ballast may appear to be set and dried on the surface but it could still be damp underneath causing a short current. Be also note full that points will also need to be cleaned out thoroughly.๐Ÿ˜Š

Posted by Deleted (d95d8da3) at 2021-12-03 09:14:30 UTC