I could do with some help....... Without boring you with the details, as my Colliery is at an elevated part of the Monmouthshire Eastern Valleys layout and I cannot electrify the points without considerable difficulty, I have decided to incorporate point levers (bit like a ground frame) so that the points (six of them) can be operated manually. I am using Peco points for this OO gauge layout and would like to put in a simple lever system to control the points position. Can anyone suggest either a commercially available example or a design which would enable me to achieve this, please, as I have failed to do so, so far? Any advice gratefully received.

Posted by xwo877 at 2021-12-23 14:31:40 UTC