Final stages done - 1) template / base made and holes made to match up to the wires - then used the base to make the holes for the wires on the layout. 2) base glued to the model 3) - 5) the walls added, including covering paper to hide the joins between the sections of wall & finally chimney pots added. Next step to install on the layout and the street lamps (x3) on the footpath (holes already made).
Posted by euan.nicholson at 2022-01-17 15:30:34 UTC