Evening folks! Not much done on #marshallsparcels this weekend due to relationship “commitments” …! 🥰 Seems to be two steps forward and one step back with the layout just now, HOWEVER, I am getting there! 😁 Almost at the point of the final build, but one or two wee things to sort before I fix it all together! I made a tarmac pad for the vehicle access to the depot from offcuts of Road Wrap ( @jeg_60 sorry, not a song!) from the SMS KX025 Modern Bridge Kit @justin.noble are SMS going to release the Road Wrap as a separate sheet? They are very useful! Anyway… decided that the area needed to be accessed from the ramp down from Marshall’s Lane as well as from a tunnel under it to the basement of the Parcels Building above! Photocopy of a Metcalfe Bridge reduced to 85% cut n pasted onto the wall. Need to weather the Parcels Truck…. One step at a time! Cheers Ross

Posted by East Coast DCC at 2022-02-20 20:17:12 UTC