#electriccapstan More work on the capstan this morning. The 'base' is now painted though I'll be redoing this to make it less green and more concrete. The capstan itself is now in place with a mashup of bits of brass attaching it to the motor. Also added is the bollard that will help divert the 'rope' away from buildings and other structures. Next up is to source some suitable 'rope' and install that, then maybe by the end of today get it installed and wired in
Posted by Josh S at 2022-03-07 09:33:06 UTC