Good morning everyone. I’ve been working on it for five months and posting the odd update since I joined here. The station at Chandwell is finally finished. It’s N Gauge and all scratch-built. I’m over the moon with how it has turned out. I’m going to make the video next and then have a week or two off modelling before turning my attention to a low relief building for behind the station which I hope will be something really special.
Posted by Chandwell at 2021-05-17 05:00:28 UTC