Platform 1 is almost ready to fit. I’ve added steps and disabled ramp this time and done a first wash on the surface. Tomorrow sees the start of adding canopies with lights, the new station building, SMS benches and advertising boards. There’s the platform lights to add as well. Hopefully, I can get it all on and wired to the distribution board.

Posted by Ian Hewitt at 2021-05-20 16:29:41 UTC