Today’s efforts have just been about lighting and wiring. All the wires are buried in each building, with the painting to happen once dry. The holes in the board are drilled and tomorrow, it’s just a case of firing all the loose wires in to the distribution board and switching on! There’s a couple of little surprises in there as well.

Posted by Ian Hewitt at 2021-05-25 16:22:49 UTC