We have put the bridge base in which is the blackboard, it is about 238mm from the top of the base board, and the length is just short of 2.4m, we are going to build the bridge piers out of plaster and we are hopeful that we can get a video of it. We are thinking of using the SMC, LX091-00 large span double track bow spring bridge kits, possibly 4 in number

Posted by rbrindley3 AKA Fred at 2021-06-13 14:12:16 UTC