#layoutbuild #microlayout #boxfilelayout A long overdue though minimal update on the boxfile build. Inlaying the ground cover between the tracks is now complete, there are a few gaps but these will easily be hidden with some static grass. I shall be leaving the track inlay till last once everything is working. I've also completed the soldering of the baseboard join using the usual copperclad soldered to the rails, this means the boards can be separated and the fiddle yard can be be put out the way while I restarted work on the main structures.

Posted by Josh S at 2021-06-22 09:24:18 UTC