Morning all! Hope you’re all keeping well. I’ve finally been able to crack on with a bit of modelling at last so, I thought I’d tackle the maze that will be the upper and lower loops and the decline. I wanted this but to be a bit of a brick monstrosity that all the buildings then pile up against so it’s certainly headed that way. There will be various girders supporting the upper loop and a large bow bridge to stretch the last gap to the far wall. The plywood base will go in next but I’m going to ballast and weather those areas around tunnel mouths before I build above. My days of being a contortionist are long behind me! #brockholme #brockholmebank #brockholmetmd #brockholmemainline

Posted by Ian Hewitt at 2021-06-29 10:55:49 UTC