More progress on my Rolling Road / Loco Tester all tracks are now in place though I see one is not straight must fix that tomorrow. The second OO Gauge track is for 3 rail Hornby Dublo locomotives to be tested and run in. I will put screws down the centre level with the top of the rails with the screw slots in line with the track and run a contact wire through the screw slots and solder in place.
Posted by andyrussell12 at 2021-07-05 22:00:58 UTC