Hmmmm thinking I love a challenge…!!! Seriously restricted space but got to pin the track down for the main connection and the fuel siding road, where the isolation switch I think needs to be moved as it’s in a visible position where it is an also a bit of a blanking plate to be fitted to the left hand side ax there already is one for the inside tunnel wall to separate the tracks this is going to be fun as all board joints will be fitted with copper clad sleepers for safety an security when in transit. Wish me luck pinning the track down lol…..!!!!

Posted by lnwr20 at 2024-02-05 19:21:57 UTC