The first bit of progress for Belgrade Street. Track is test pinned down with everything cut to length and a nice, easy flow for vehicles rolling freely across points. I’ll mark all the positions of points and track, lift and drill for power access and point motors. Then, I’ll run for a bit before adding catenary masts and ballast. Happy days! #belgradestreet #brockholme #brockholmetmd #brockholmebank #oogauge #microlayout

Posted by Ian Hewitt at 2024-02-10 17:09:47 UTC