The rework of the station is almost done. The bridge and ramp has had a new wrapping with SMS stone. The road on the bridge still needs its wrap but everything else is mostly done at this point while the glue cures. Half the access ramp to the clay dryer is made from sheets of card glued in layers and butted up against the side of the rail. The ramp I think maybe a bit to wide so I may add some scenery to disguise that but first I need to finish the rest before doing so.
Posted by Ian of Alesmead at 2024-02-11 16:58:47 UTC