#eastglassonportauthority #tracklaying Got the baseboards upstairs today and on the base table, which has had another pair of legs added to help get everything level. After that, a bit of paper work to get the track plan to fit, it was out with the power tools and track cutters. I want to get all the various holes and cut outs in the baseboards done this evening if I can then tomorrow I can concentrate on the track laying and wiring

Posted by Josh S at 2024-02-11 18:08:32 UTC