#eastglassonportauthority #tracklaying Good progress with track laying today, after an emergency dash to model shop for more fishplates. Nearly all the track is down with droppers attached ready for the bus to be wired up and maybe, just maybe, trains moving before we go away at the weekend. A couple of curve balls thrown up, mainly the 'short Y' point at the entrance really cocked up the angles resulting in buffer locking with anything other than a short wagon, so that needs replacing. However I have got one of the joins installed with some copper clad and a lot of solder! Lastly the wagons used for testing have been posed to show off the benefits of the removable backscene to really give some height to the backdrop.

Posted by Josh S at 2024-02-12 16:20:34 UTC