#drystonewalls Initial stage of the dry-stone walling completed. Scratch build using, five parts cat litter (the gravel-type which doesn’t expand when absorbing liquids) and,one part wall filler. Mix thoroughly whilst dry and then add sufficient liquid (PVA glue and water 50/50 mix) until the mix resembles thick porridge. You should have been 15-20 mins working time, depending on the ambient temperature of your work space. Experiment with designs (no two walls can ever be the same). I have purposely made these new walls slightly bigger to give an optical feeling of the area being closer to the eye/camera lens. Again, the perspective you create is for your layout (invoke rule #1 to quieten the rivet counters if necessary) Once the walls are fully cured, I’ll add the road surface and then continue with the other scenics necessary…

Posted by Arboleas Junction at 2024-02-14 16:26:07 UTC