#eastglassonportauthority #tracklaying Today has seen the completion* of the track work. The joins across the two boards have been thoroughly soldered down, new points installed, and the majority of the wiring bus connected up. The next job after we're back from a long weekend away will be to cut access holes in the left hand board to enable access to the wiring, and electrically connecting the two boards. The actual running of trains is a bit off yet, but it's getting there. *There's a couple of bits still to wire in and fix down but these are dependent on what buildings I decide to include

Posted by Josh S at 2024-02-16 14:25:32 UTC