Silver sharpie arrived yesterday , so it was on with the task of applying the silver frames to the glazing pieces. ATS coach fully assembled up with the PTS the next to be assembled / chassis parts glued in place

Posted by Luciton St James at 2021-07-10 07:18:01 UTC