#eastglassonportauthority What's been going on recently then? Not a great deal, however I've got all the point frogs wired up to the frog juicer, and started on the ground cover, which consists of embossed setts laid onto flooring underlay courtesy of @JohnnyRock, which is sanded down to reduce the height and prevents the plastic sitting above the top of the rail. Next up is to start on planning out what buildings are going where and get the bridge installed

Posted by Josh S at 2024-02-28 20:12:01 UTC