Slow progress on my layout, mainly because work keeps getting in the way. The girder bridge needs weathering, OHLE needs to be installed, the churchyard needs some gravestones and the wall to be completed and I need to ballast the track! The Heljan Class 86 is a lovely engine though and runs very smoothly.

Posted by mikehill at 2021-07-11 14:30:25 UTC