#weekendmodelling The new lift out section for the layout is complete, except for the ballesting. All three tracks and faller road working, a lot happier now, no wires to get pulled by mistake. I have put two magnets on either side to hold the side facia in place.
Posted by doug.bull1 at 2021-07-11 14:35:45 UTC