Good evening all, well decided it’s about time to sort out the fiddle yard connection, as it failed when I was at Model Rail Crewe. So it’s been removed and is being relayed, this time with set track instead of flexi. The copper clad is being reused as is the wiring except the cross track feed, that’s going to be new wire from the fiddle yard main access to the fuel tank siding line that is at the back of section 1. Works are ongoing and will hopefully be completed over the weekend.
Posted by lnwr20 at 2024-07-19 20:30:12 UTC