A quick word about what's happening, and a change of plan, at Clydebridge Station. The happening, is that the October update will be live on Youtube, on Satruday, at 10:00. The change of plan? Well, in ordering some stuff from SMS, I ordered the wrong shade of red brick. However, it won't be going to waste, as whilst I cannot complete the station side retaining wall, as the shades are different, I can use it for something else. I ordered the TX198 instead of the TX253! The plan, starting later this week, and which will progress right up to the November update, will see me use the TX198, to replace the retaining wall in the depot. The existing wall was poorly built, certainly the uprights were, different heights, meaning the coping stones going up and down. Instead, I'll be taking my time, to replace the depot retaining wall, with a new one, to the same design as that in the station, but a different shade! Work has already started, with me removing bits of the old wall. It'll be a big job, but it's a job I need to do.
Posted by Robert Clark at 2024-10-02 18:08:41 UTC