The progression of the instal of the Trap Point from the rails being cut and removed the sleepers lifted and ballast removed. To the installation of the Trap and the ballasting up and finally the glued ballast, to say it looks good is an understatement it was something I’ve pondered about for a while now, an to see it in place it looks like it’s always been there…. Just have to cut back the Peco Point stubs for hand use as it will be kept in the straight route.

Posted by lnwr20 at 2024-10-07 01:59:19 UTC