I’m beginning to try and get my head around extending Lock Down onto another board, I want a decent station a scenic storage area and a traction depot for the diesels. The two tracks on the left will be the in /out to Lock Down and the lower loop. The single track out on the right will complete the loop. Q’s this is in Peco set track, I want to use points that have powered frogs, so are they Streamline? If so do they have the same geometry as set track? If anyone wants to throw two penn’orth into the planning stage I would be most grateful and receptive. Can’t seem to make sense of the Peco website.
Posted by Gez - Lock Down Railway at 2024-10-20 14:27:25 UTC