A little progress on Corrour Moor today. The signal cabin that is let out is now nearly finished however I have messed up the windows, tried using glue and glaze to fill the windows but look a bit murky not really what I was expecting. I Should of probably used clear plastic.. Now I have started thinking about the scenic break at one end and will be using a girder bridge as pictured below. My question is will this look too steep as a footpath in N gauge. Distance from the foot crossing is about 12 - 18 inches. I would like peoples thoughts. See pictures two and three.

Posted by Bruce at 2024-11-09 17:55:34 UTC