Project: Warehouse. So here we go. The big job before the debut show in March. This low relief warehouse is going to sit on the front wall of the fiddle yard at the left hand end of the layout. The base was very kindly done by SMS (thank you again Justin), and will feature a lot of SMS windows and sliding doors. The card layer will be covered in embossed brick sheet, and will have a removable section in the middle to accommodate the removable back scenes on the layout. This is the last major structure to go on the layout and I'm really looking forward to cracking on with it. #eastglassonportauthority #scratchbuild #scratchbuilding #projectwarehouse
Posted by Josh S at 2025-01-21 08:59:50 UTC