#steamyardbuild An evening update on the steam yard build. The secure store area base is completed, with fencing and, in place. I'm currently building a racking system with an awning to fit at the rear of the store area. I've also included a loco access ramp at the front of the engine shed. The three secure operation/storage/tool sheds SMS Kit # KX118 are in place along with some of the paved walkways. Steel tube safety railings SMS kit # 097-00are also due to be added during this coming week. I've included a few pics...

Posted by Arboleas Junction at 2025-03-10 21:06:00 UTC