Small update on my lighting installation. Fitted the water tower I built over a year ago into the engine shed this afternoon. It’s just about visible on the left side of the track. Ironically, in the scheme of things I ultimately plan to remove the engine shed once I’ve built my quarry. However given how long it’s taken me to get to this stage, it’s here to stay for some time!
Posted by Chris Clennett at 2025-03-12 20:52:48 UTC