#newngaugebuild A day in the garage, working on the new N gauge layout and, with the necessary track pinned down to allow for platform positioning. The station building base platform built and, with a test carriage running, the gap tolerance if perfectly acceptable. Currently have the rest of the platform surfaces, which were cut and, test fitted earlier, with the under edging, now under several weights, for the adhesives to cure over the next 24hrs.
Posted by Arboleas Junction at 2025-05-03 19:26:00 UTC