Good morning all, back again, another building for Crag end, the building is a Petite Properties (sorry @Justin), roof is the Free TX103-OO Terracotta Pantiles-Weathered roofing, with weathering powder to darken it down. So, 2 down and 2 more to go, then possibly we will be finishing off the raised Dylington cottages area and setting up the village/town. Major engineering work will then be carried out to A) Get all the track working etc, and wiring , bearing in mind it is all circa 1964 Triang Super 4 track. Ensuring the point system works (all hand operated initially), some will be electrically operated ( I hope). Wiring all the buildings that have lights street lights and ensuring ALL the track, Mainline, Local Line, Wagon/Coach, Locomotive repair yard (which is fairly large and complicated. I think the points setup will be, erm 'Interesting', is the word ) Also the fiddle yard (oh joy) lol. Then maybe we will be running Locomotive Yaay!!. Well, that's it for now, so watch this space 🤔😀🤣🤣
Posted by Dave & Jane - djp45mail at 2025-06-05 09:34:25 UTC