I have attached an anyrail photo of my proposed LMS era 3/4 terminus which is partially based on Tottington station as a terminus. It is intended to be DCCand installed in my 6ft by 8ft shed later this year. As it is my first DCC and larger layout is there anything I should watch out for when wiring.
Posted by Dererik at 2026-02-08 14:35:29 UTC