Pit head buildings now lit and for the first time the winding cables are attached to the winding room. What a fiddle to get them in though. They are fastened to springs inside the pit head building to keep them in tension. The boys are admiring the light after being underground. 🤭
Posted by Gez - Lock Down Railway at 2026-02-11 11:21:05 UTC