#station_building : It's been a good while since I last posted but there has been progress! The main curtain wall is now pretty much complete, except for the windows & details such as drain pipes etc. In the mean time I've been working on the lighting for the main building. I've already got a lighting bus which runs at 9v & I've taken this to a bank of switches mounted on the layout board. Each switches on one of the 5 zones of lighting in the station building. The pictures show the upper storey ceiling with lamps mounted with the two zones lit in turn. At least it all works!! No failed LEDs either!
Posted by Shawbridge at 2026-04-24 15:39:37 UTC