Hi all. I’ve been asked to design a point control system for a big club layout. There are c.30 points and we want 2-3 control panels for 2-3 operators, on a separate bus to the main DCC bus. The point motors are analogue/solenoid. If it was you, what control system would you favour, and why? Thanks in advance.

Posted by Dom at 2021-08-14 13:18:31 UTC