More progress today. Glued foam with hard as nails, (thanks guys), topped with 9mm MDF except around gorge. Finished off with plaster bandage in small pieces to build strength. I’ve learnt the hard way it’s best to keep track level if possible, hopefully scenic bits including pigs nose tor will avoid a flat look.
Posted by pharrold at 2021-08-21 12:36:29 UTC