Beginning to place buildings on the layout. Pickwick Line 4mm scale. The front buildings are temporary Hornby/Bachmann buildings, which will be swapped for a scratch built station. The rear high street buildings are all scratch built during various lockdowns, from scale drawings I made.

Posted by Pickwick Line at 2021-08-23 20:55:00 UTC